Projetos Institucionais

NOVO ACESSO SOCIAL DO CLUBE HEBRAICA | 2016Localização São PauloÁrea Tipo institucional Etapa executivo Devido ao processo de transformação interna que o Clube Hebraica, se viu a necessidade de reestruturação e modernização de seus espaços, pensando sempre em atender de forma cada vez melhor os sócios e usuários,...
ENSINO MÉDIO E CURSO PREPARATÓRIO | 2014Localização São Paulo, SPÁrea 10 000,00 m²Tipo institucionalEtapa projeto básico
TECHNOLOGICAL AND RESEARCH CENTER | 2010 Location São Paulo, SP Area 3 400,00 m² Type institutional Stage design development | construction documents This project had a hard challenge to conciliate in one building three different industries, where it would be developed pieces and equipment for the Brazilian Nuclear...
NACIONAL ACCOUNTING COUNCIL EXPANSION | 2007 Location São Paulo, SP Area 6 300,00 m² Type institutional Stage built In 2006 CRC SP purchased an adjacent building with the objective of integrating it to the existing building. The union between the new and the existing building was...
ELEMENTARY PUBLIC SCHOOL | 2005 Location Osasco, SP Area 2500,00 m² Type institutional Stage built In a poor block in the city of Osasco, in the metropolitan region of São Paulo, the project is located in the top of the hill that conquers the vale. The indoor...
CIVIC CENTER REFURBISHMENT | 2004 Location São Paulo, SP Area 2 200,00 m² Type institutional Stage built The original building that houses the Club’s Social Headquarters was designed by Jorge Wilheim. It expressed the ideal concepts of modern architecture such as great spans, terraces and overhangs. In...
NURSERY | 2003 Location São Paulo, SP Area 95,00 m² Type institutional Stage built The new nursery Project emerges along other projects conceived by our office upon conclusion of the Director´s Plan for the Hebraica Club. The development of this Director´s plan purpose was to formulate long...
MUSIC SCHOOL | 2003 Location São Paulo, SP Area 125,00 m² Type institutional Stage built